卡塔尔市政工程延期原因及对策分析
韩磊
(中交四航局第二工程有限公司,广东 广州 510230)
文献要素
摘要:中资总承包企业纷纷进入卡塔尔市场,但81%的承包项目存在工期延期现象。在介绍卡塔尔建筑市场背景以及市政基础设施等项目基本情况的基础上,总结工期延期的原因,并就外部因素、业主因素、工程师因素和承包商因素提出相关对策,对将进入卡塔尔的中资施工企业投标时考虑延期风险,防范工期延期具有一定的参考作用。
关键词:市政工程;工期延期;投资规模;施工企业
Abstract:Chinese general contracting enterprises entering the Qatar market,81% of the contracted projects are delayed. Firstly,the paper introduces the background of construction market in Qatar,as well as the basic information of municipal infrastructare projects. Then,summarizes the reasons for time delay. Based on describing the detail of time delay,finally gives the related countermeasures that will be benefit for the contractor to avoid the time delay.
Keywords:infrastructure project;project delay;investment scale;construction enterprise
参考文献
[1] Hassan Emam. Cause of delay on infrastructure project in Qatar[C].31st Annual ARCOM Conference,2015.
[2] Mahamid,I . Contributors to schedule delays in public construction projects in Arabia:Owners’ perspective[J]. Journal of Construction Project Management,2013(2):608-619.
[3] 武艺,张尚.基于FIDIC合同条件的国际工程项目竣工日期研究[J].建筑经济,2016(1):33-36.
[4] Hasan,R,Suliman,S,Malki,Y. An Investigation into the Delays in Road Projectsin Bahrain[J]. International Journal of Research in Engineering and Science,2014,2(2):38-47.
[5] 李锐娟,王玉平,陈晖.国际工程成本风险分析与对策[J].建筑经济,2016(3):16-19.
[6] 鲜仕君.卡塔尔项目工期延误为何频发[J].施工企业管理,2014(9):113-115.
工程经济,2017(01):38-41
下载地址